Archive for the ‘Making Fuselage’ Category

Vacation projects

Looking more like an airplane

Looking more like an airplane

Pedal plane coming along

Pedal plane coming along

The control linkage soon to be attached.

The control linkage soon to be attached.

The landing gear legs were installed today.

The landing gear legs were installed today.

Bending the fuselage sides

One of the required tasks for construction of this pedal plane, is the job of bending each of the fuselage sides. This is needed so that the tail comes together smoothly to a triangle type point.






soaked side


When you are all done, just leave it in the jig over night to dry. Then do the second side.

2nd Fuselage Dry Fit

It wasn’t long before Michael had some plane parts pushed together to resemble what is soon to come. In these photos we actually had the “dado” cuts already made on the fuselage. This meant that the backrest, firewall, and instrument panel could actually ‘slide into place.’ Our next step is to bend the fuselage sides and actually start gluing pieces together.